Credit Cards Accecpted

Click the globe to see our daily shipping map.

Print InstructionsInstructions | Saddlebag Extension Install

Saddlebag Extension Install

1) Remove saddlebags from bike, leaving rubber isolators in place.
2) Sand lower edges of bags and contact flanges of extension with 36 grit sandpaper.
3) Position extension on bottom of bag until all parts of bag fit smoothly.
No Picture 4) Draw lines with Sharpie or place tape from bag to extension to make quick reference for quickly positioning the two pieces once the adhesive is applied
5) Apply appropriate adhesive to bags and extensions.
*Tip: We use 3M Automix Semi-Rigid Parts Repair (3M part number 8235). The 200mL cartridge is a two-part urethane adhesive used to repair Xenoy, PRIM, GTX, PPO, ABS, and a variety of other semi-rigid plastic parts and has a very useful 50 second work time, although other similar products exist.
6) Hold bag and extension in place until the adhesive’s set time expires.
7) Allow adhesive to cure.
8) Sand joint level with bag and extension.
9) Sand sides and ends of bag with 80 grit sandpaper on a dual-action sander.
10) Apply body filler over joint and taper filler onto both sides.
11) Block sand with 36 grit sandpaper.
12) Reapply body filler.
No Picture 13) Block sand with 80 grit sandpaper until everything is even and smooth, re-applying and sanding as necessary to achieve a smooth, ripple free surface.
14) Sand all surfaces lightly with 180 grit sandpaper.
A Division of Hinsey's Pro Paint, Inc.
630 High Street, Fort Wayne IN, 46808
260-407-2000 | hinseys@msn.com | Locate Us